Is this page helpful?
5319x
000015
2018-12-03
P

Project navigator

In the Project Navigator of the program generations RFEM 5 and RSTAB 8, all the data of a model opened in a clearly arranged tree structure are displayed.

At the bottom of the Project navigator are three tabs (or four tabs after the calculation). Use these tabs to switch between the Data, Display, Views, and Results navigators.

Data navigator

The Data navigator manages the model and load data as well as the results and printout reports.

Display navigator

This navigator controls the graphical display of objects in the work window.

Views navigator

The Views navigator manages user-defined views as well as user-defined and automatically generated visibilities.

Results navigator

This navigator allows you to control which results are displayed in the graphic.

Info

In the program generations RFEM 6 and RSTAB 9, the Project navigator is referred to as a Navigator.


Links
References
  1. Dlubal Software. (2018). Manual RFEM. Tiefenbach.
  2. Dlubal Software. (2016). Manual RSTAB. Tiefenbach: Dlubal Software.