002979
2021-12-20

Due to new technical requirements, investor Melamin d.d. Kočevje decided to replace the old fossil fuel boiler (Đuro Đakovič, No. 5356) with a new boiler with a total capacity of 9.8 MW.

The new system for steam production consists of biomass storage, a transport and delivery system for woodchips, a steam boiler, and an ash collector.

The new boiler house was a demanding project from a technological and execution point of view. The construction was also difficult because it took place while the existing boiler (Loos, No. 61428) was in operation. The old boiler is currently used for temporary steam production, while in the future, it will only be used as a backup.

AG-inženiring d.o.o.
Kočevje, Slovenia
ag-i.si

Model and Deformation of Boiler House in RFEM (© AG-inženiring)


(0)
0 out of 5 stars
5 star 0
4 star 0
3 star 0
2 star 0
1 star 0

Boiler House Structure

You can download this structural model to use it for training purposes or for your projects. However, we do not assume any guarantee or liability for the accuracy or completeness of the model.

Report This 3D Model