1288x
001063
2020-09-07
In the course of the Elbe-Havel Canal expansion, the Güsen road bridge was replaced by a new construction at the same location. This new construction was necessary because the clear width and height of the existing bridge were not sufficient for the next development of the waterway.

In order to maintain an important road connection over the canal, the construction of a temporary bridge was required.

The company grbv Ingenieure im Bauwesen GmbH & Co. KG from Hanover, Germany, was responsible for the planning and structural design of the new and the temporary bridge as well as for the demolition of the existing bridge. For the static calculations, grbv used a.o. the framework program RSTAB.

Investor
Waterways and Shipping Directorate East, Waterways
Construction Authority of Magdeburg
www.wsv.de.

3D model (© grbv)

(0)
0 out of 5 stars
5 star 0
4 star 0
3 star 0
2 star 0
1 star 0

Road Bridge

No Download Possible Customer Project / View Only
Number of Nodes 228
Number of Members 687
Number of Load Cases 153
Number of Load Combinations 2
Number of Result Combinations 39
Total Weight 553.655 tons
Dimensions (Metric) 100.382 x 13.350 x 14.700 m
Dimensions (Imperial) 329.34 x 43.8 x 48.23 feet
Program Version 8.11.01
Report This 3D Model