Due to the new technical requirements, the investor Melamin d.d. Kočevje decided to replace the old fossil fuel boiler (Đuro Đakovič, No. 5356) with a new boiler with a total capacity of 9.8 MW.
The new system for steam production consists of biomass storage, a transport and delivery system for woodchips, a steam boiler, and an ash collector.
The new boiler house was a demanding project from a technological and execution point of view. The construction was also difficult because it took place while the existing boiler (Loos, No. 61428) was in operation. The old boiler is currently used for temporary steam production, while in the future, it will only be used as a backup.
AG-inženiring d.o.o.
Kočevje, Slovenia
ag-i.si
Model and Deformation of Boiler House in RFEM (© AG-inženiring)
The new system for steam production consists of biomass storage, a transport and delivery system for woodchips, a steam boiler, and an ash collector.
The new boiler house was a demanding project from a technological and execution point of view. The construction was also difficult because it took place while the existing boiler (Loos, No. 61428) was in operation. The old boiler is currently used for temporary steam production, while in the future, it will only be used as a backup.
AG-inženiring d.o.o.
Kočevje, Slovenia
ag-i.si
Model and Deformation of Boiler House in RFEM (© AG-inženiring)
Submodels
Structure of Boiler House
No Download Possible
Customer Project / View Only
Number of Nodes | 1662 |
Number of Lines | 2407 |
Number of Members | 1336 |
Number of Surfaces | 273 |
Number of Load Cases | 1 |
Total Weight | 2406.596 tons |
Dimensions (Metric) | 38.108 x 45.940 x 19.081 m |
Dimensions (Imperial) | 125.03 x 150.72 x 62.6 feet |
Program Version | 5.02.00 |