616x
001232
2020-11-06
Due to new technical requirements, investor Melamin d.d. Kočevje decided to replace the old fossil fuel boiler (Đuro Đakovič, No. 5356) with a new boiler with a total capacity of 9.8 MW.

The new system for steam production consists of biomass storage, a transport and delivery system for woodchips, a steam boiler, and an ash collector.

The new boiler house was a demanding project from a technological and execution point of view. The construction was also difficult because it took place while the existing boiler (Loos, No. 61428) was in operation. The old boiler is currently used for temporary steam production, while in the future, it will only be used as a backup.

AG-inženiring d.o.o.
Kočevje, Slovenia
ag-i.si

Model and deformation of a boiler house in RFEM (© AG-inženiring)

(0)
0 out of 5 stars
5 star 0
4 star 0
3 star 0
2 star 0
1 star 0

Reinforced Concrete Structure

No Download Possible Customer Project / View Only
Number of Nodes 187
Number of Lines 272
Number of Members 17
Number of Surfaces 67
Number of Load Cases 8
Number of Load Combinations 141
Number of Result Combinations 2
Total Weight 1552.762 tons
Dimensions (Metric) 32.960 x 15.300 x 13.110 m
Dimensions (Imperial) 108.14 x 50.2 x 43.01 feet
Program Version 4.10.19
Report this 3D Model