805x
001234
2020-11-06
Due to the technical requirements, investor Melamin d.d. Kočevje decided to replace the old fossil fuel boiler (Đuro Đakovič, No. 5356) with a new boiler with a total capacity of 9.8 MW.

The new system for steam production consists of biomass storage, a transport and delivery system for woodchips, a steam boiler, and an ash collector.

The new boiler house was a demanding project from a technological and execution point of view. The construction was also difficult because it took place while the existing boiler (Loos, No. 61428) was in operation. The old boiler is currently used for temporary steam production, while in the future, it will only be used as a backup.

AG-inženiring d.o.o.
Kočevje, Slovenia
ag-i.si

Model and deformation of a boiler house in RFEM (© AG-inženiring)

(0)
0 out of 5 stars
5 star 0
4 star 0
3 star 0
2 star 0
1 star 0

Steel Structure for Boiler House

No Download Possible Customer Project / View Only
Number of Nodes 351
Number of Lines 609
Number of Members 573
Number of Load Cases 6
Number of Load Combinations 12
Number of Result Combinations 4
Total Weight 33.804 tons
Dimensions (Metric) 18.515 x 12.194 x 11.564 m
Dimensions (Imperial) 60.74 x 40.01 x 37.94 feet
Program Version 4.10.19
Report This 3D Model