The example describes traffic loads running on a bridge construction, illustrating the module's application possibilities.
A truck with a load of 300 kN (tandem system with double axles) is running on a deck of 50 m x 8 m. On the second lane, the load position of a tandem axle system of 200 kN is parallel applied.
Additionally, a uniform loading of 9 kN/m² is acting on lane 1, and of 2.5 kN/m² on lane 2. It must be considered in a distance of 1.5 m in front of and behind the tandem axles.