570x
000937
2020-08-21
Bridge for cyclists and pedestrians across the Neckar River between Marbach and Benningen
Investor:
City of Marbach am Neckar and the municipality of Benningen
Design and structural engineering:
Hildenbrand Ingenieure GmbH + Co KG
| Ludwigsburg, Germany
Services:
Object and structural design with all service phases of HOAI §55 and §64 including engineering control (local construction management at the city of Marbach)

Hildenbrand Ingenieure
www.hildenbrand-ing.de

3D model (@Hildenbrand Ingenieure)

(0)
0 out of 5 stars
5 star 0
4 star 0
3 star 0
2 star 0
1 star 0

Neckarsteg | Marbach am Neckar

No Download Possible Customer Project / View Only
Number of Nodes 192
Number of Lines 444
Report this 3D Model