The ALBYR Structures team was commissioned to design a new industrial hall in a high seismic activity region. The hall includes seven interior double-hinged frames with tapered beam ends as well as floor levels for offices. The columns were designed to support crane girders for a 5.5-ton crane.
CP 001146 | Industrial Building in Alpes-de-Haute-Provence Department, France
;